Line 1: Line 1:
 ====== Implementation of continuous cal at Ke ====== ====== Implementation of continuous cal at Ke ======
-edit /​usr2/​control/​skedf.ctl+In ''​station.prc'',​ take out calls to ''​caltsys_man'',​ ''​systemp12''​
  
-<​code>​ +In ''​setupsx'',​ set <​code>​cont_cal=on</​code>​. In ''​caltsys'',​ remove ''​caltsys_man''​ and replace with ''​tpicd=tsys''​. Remove ''​ifagc''​ and ''​bbd_gain=all,​agc''​ calls
-cont_cal ​ON+
  
 +In ''​point.prc'',​ in ''​initp'',​ ''​cont_cal=on''​
  
 +''/​usr2/​control/​skedf.ctl''​ added <​code>​tpicd NO 300</​code>​ and changed to ''​cont_cal ON''​. Tsys will be logged every 30 sec by default.
 +
 +Edited both files in ''/​usr2/​control/​rxg_files''​ and changed creation date, in 7th line+, commented out previous tcal value and inserted measured values from Jamie. Measured Tcal values (as of April 15 2014):
 +<​code>​
 +RCP Cont-CALs
 +Channel Freq Tcal(K) sigma_TCAL (K)
 +X1U 8217 8.9 0.2
 +X1L 8209 8.8 0.3
 +X2U 8257 7.5 0.3
 +X3U 8357 7.7 0.3
 +X4U 8517 8.5 0.2
 +X5U 8737 7.9 0.4
 +X6U 8857 7.3 0.4
 +X7U 8916 7.7 0.4
 +X8U 8937 7.3 0.5
 +X8L 8929 7.3 0.5
 +S1U 2230 15.5 0.3
 +S2U 2250 11.0 0.3
 +S3U 2270 11.7 0.3
 +S4U 2300 12.1 0.2
 +S5U 2350 11.7 0.2
 +S6U 2370 12.1 0.2
 </​code>​ </​code>​
  
-in station.prc,​ take out calls to caltsys_man,​ systemp12 +I've also added some notes on [[operations:​documentation.contcal|Continuous calibration]]
- +
-in setups, set <​code>​cont_cal=on</​code>​In caltsys, remove ''​caltsys_man''​ and replace with '​tpicd=tsys''​. Remove ifagc and bbd_gain=all,​agc calls +
- +
- +
-in point.prc, in initp, ''​cont_cal=on''​ +
  
  
/home/www/auscope/opswiki/data/attic/blog/implementation_of_continuous_cal_at_ke.1398234656.txt.gz · Last modified: 2014/04/23 06:30 by Jim Lovell