User Tools

Site Tools


handover:hob010

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:hob010 [2016/12/22 11:55]
Lucas Hyland
handover:hob010 [2016/12/22 18:08]
Lucas Hyland
Line 7: Line 7:
    * 1730UT experiment started OK (JS)    * 1730UT experiment started OK (JS)
    * 23:54 UT drive power switched off, via DESK control (remote vdesk operator unaware of current experiment?​),​ power came back up at 23:56 UT and telescope back on scheduled source (Warren)    * 23:54 UT drive power switched off, via DESK control (remote vdesk operator unaware of current experiment?​),​ power came back up at 23:56 UT and telescope back on scheduled source (Warren)
-   * 1040UT mk5cn connection error, Halt experiment and restart mk5ho (Note start DIM with ''​DIMino -m0''​) (JS)+   * 1040UT mk5cn connection error, Halt experiment and restart mk5ho (Note start DIM on ''​oper@mk5ho'' ​with ''​DIMino -m0''​) (JS)
    * Reestablish at 1119UT    * Reestablish at 1119UT
       * Scans missed 357-1040 through 357-1119       * Scans missed 357-1040 through 357-1119
 +   * 1240UT repeated mk5cn errors, reset mk5ho again (JS)
 +      * lost scans 357-1240 through 357-1255
  
 +
 +   * **NOTE: REcording switched to module MAT+0005 at 1255UT (after mk5ho reset) 692 GB of data recorded here**
 **Hobart 12m** **Hobart 12m**
  
/home/www/auscope/opswiki/data/pages/handover/hob010.txt · Last modified: 2016/12/22 18:08 by Lucas Hyland