User Tools

Site Tools


handover:ohg118

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:ohg118 [2019/04/04 02:27]
Patrick Yates
handover:ohg118 [2019/04/04 02:29] (current)
Patrick Yates
Line 29: Line 29:
     * 13:21UT - HOB+1006 is full, switched to HART+101 (Patrick)     * 13:21UT - HOB+1006 is full, switched to HART+101 (Patrick)
     * 14:02UT - HART+101 is full. On my way to Mt Pleasant to put a new module in. (Patrick)     * 14:02UT - HART+101 is full. On my way to Mt Pleasant to put a new module in. (Patrick)
-    * 15:05UT - Swapped out HART+101 for HOB+1007 (bank B). Schedule resumed. (Patrick)+    * 15:05UT - Swapped out HART+101 for HOB+1007 (bank B). Schedule resumed. ​Missed scans 093-1403 through 093-1507 ​(Patrick)
       * Disk VSN: HOB+1007/​16000/​1024 | Data volume at beginning: 0 GB       * Disk VSN: HOB+1007/​16000/​1024 | Data volume at beginning: 0 GB
     * 15:10UT - SX receiver pressure + temperature started to rise, turned on pump for half an hour to lower these values. (Patrick)     * 15:10UT - SX receiver pressure + temperature started to rise, turned on pump for half an hour to lower these values. (Patrick)
/home/www/auscope/opswiki/data/pages/handover/ohg118.txt · Last modified: 2019/04/04 02:29 by Patrick Yates