User Tools

Site Tools


handover:ohg119

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:ohg119 [2019/06/05 11:24]
Chin Chuan Lim
handover:ohg119 [2019/06/07 03:36] (current)
Jayender Kumar
Line 12: Line 12:
    * Windstowed 0518-> (JMc)    * Windstowed 0518-> (JMc)
    * 0714UT Schedule was put on halt beacuse of bad wind condition. will put it back on schedule when wind problem solves out. (Jay)    * 0714UT Schedule was put on halt beacuse of bad wind condition. will put it back on schedule when wind problem solves out. (Jay)
-   * 1118UT Wind speed is now ok and stable. I put telescope back on schedule. starting from scan 156-1124. (Jay)+   * 1118UT Wind speed is now ok and stable. I have put telescope back on schedule. starting from scan 156-1124. (Jay)
  
 **Katherine 12m** **Katherine 12m**
/home/www/auscope/opswiki/data/pages/handover/ohg119.txt · Last modified: 2019/06/07 03:36 by Jayender Kumar