 Module: HOB+1004, start pos: 4819.273 GB Module: HOB+1004, start pos: 4819.273 GB
  
 +Windstowed 0436-052 (JMc)
 +
 +Major antenna failure after 1330 UT (Ross) ​
  
 **Katherine** **Katherine**
Line 10: Line 13:
 Module: HAY-0062, start pos: 159.511 GB Module: HAY-0062, start pos: 159.511 GB
  
 +Network interruption at ~0300 with associated clock break - likely a brief power glitch. pps_delay through dbbc showed slippage between 0300 and 0315 although no dot? errors. Reconfigured DBBc at 0315, schedule resumed at 0320. (JMc)
 +
 +Scans affected: 265-0258 to 265-0318
 +
 +2015.265.16:​12:​01 ALARM: Delay through DBBC has changed. Scans 265-1611a through 1615b affected (Ross).
 +
 +2015.265.16:​36:​03 ALARM: Delay through DBBC has changed. Scans 265-1635 through 1641a affected (Ross).
  