Fringe checks done with Hb, Ke, source 1921-293, only one fringe found (channel 04).

Hobart

Module: HOB+0125, start pos 10762 GB (Jamie said this module was good to record to, leaving the empty 8 TB)

  • During set up, FS reporting “-888 DBBC PPS error” every few minutes. Tried restarting + reconfiguring dbbc many times. Fmset reports no problems, autocorrelation of test scan looks fine. (Ellen)
    • Jamie fixed this by just running clkoff and maserdelay…

Katherine

Module: BKG-0037, start pos 0 GB

Yarragadee

Module: USN-0131, start pos 742 GB

  • During setup, everything worked fine until I tried to record a test scan, then the mark 5 froze and reported connection error. Restarting and rebooting and recycling the power made no difference; everything was fine until it tried recording every single time. (Ellen)
    • J-Mac determine that module HOB+0127 (7218 GB used out of 32 TB) is busted and so this is being shipped down to be fixed.
You could leave a comment if you were logged in.
/home/www/auscope/opswiki/data/attic/handover/r1769.1480934338.txt.gz · Last modified: 2016/12/05 10:38 by Bryn Emptage