User Tools

Site Tools


handover:r1779

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
handover:r1779 [2017/02/13 23:23]
Ross Turner
handover:r1779 [2017/02/14 01:22]
Warren Hankey
Line 9: Line 9:
   * 12:30UT DBBC target levels way too low in ifd, I have now set at 45000 (Ross)   * 12:30UT DBBC target levels way too low in ifd, I have now set at 45000 (Ross)
   * 17:00UT Experiment started OK. (Ross)   * 17:00UT Experiment started OK. (Ross)
-  * NEW MODULE NEEDED BEFORE 14:50 ADST!!+  * (044)01:18 UT Swapped to module HART+101 (Warren)
  
   ​   ​
/home/www/auscope/opswiki/data/pages/handover/r1779.txt · Last modified: 2017/02/14 06:02 by Warren Hankey