User Tools

Site Tools


handover:r1973

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:r1973 [2020/11/16 15:31]
Patrick Yates
handover:r1973 [2020/11/17 03:10] (current)
Warren Hankey
Line 7: Line 7:
  
    * 1700UT Experiment started OK (Patrick)    * 1700UT Experiment started OK (Patrick)
 +   * 2218 UT Halted to try fix x-band bad LNA voltage (warren)
 +   * 0300 UT resumed schedule with 322-0300a (w)
/home/www/auscope/opswiki/data/pages/handover/r1973.txt · Last modified: 2020/11/17 03:10 by Warren Hankey