User Tools

Site Tools


handover:r4841

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:r4841 [2018/05/11 06:40]
Warren Hankey
handover:r4841 [2018/05/11 09:18] (current)
Arwin Kahlon
Line 10: Line 10:
    ​*06:​24 UT delay large reconfigure dbbc  (W)    ​*06:​24 UT delay large reconfigure dbbc  (W)
    ​*06:​38 UT resumed schedule (W)    ​*06:​38 UT resumed schedule (W)
 +   ​*09:​02 UT Halted schedule. Delay was drifting again, power-cycled dbbc. (Arwin)
 +   ​*09:​16 UT resumed schedule. (Arwin)
  
 **Yarragadee 12m** **Yarragadee 12m**
/home/www/auscope/opswiki/data/attic/handover/r4841.1526020804.txt.gz · Last modified: 2018/05/11 06:40 by Warren Hankey