User Tools

Site Tools


handover:r4875

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
handover:r4875 [2019/01/04 14:26]
Tiege McCarthy
handover:r4875 [2019/01/04 16:08] (current)
Tiege McCarthy
Line 14: Line 14:
    * 1023 UT - The ckloff value dropped to the order of E-001. Tried both re-configuring and rebooting the dbbc but to no avail. The fmset values were also in sync until around 1100UT (when the mark 5B clock was ahead by 0.2). Did an fmset sync at this stage which fixed the issue. The scans from 004-1026 to 004-1044 were probably affected due to the high clkoff value. The schedule was halted from 004-1046 to the 004-1053a (Prad). ​    * 1023 UT - The ckloff value dropped to the order of E-001. Tried both re-configuring and rebooting the dbbc but to no avail. The fmset values were also in sync until around 1100UT (when the mark 5B clock was ahead by 0.2). Did an fmset sync at this stage which fixed the issue. The scans from 004-1026 to 004-1044 were probably affected due to the high clkoff value. The schedule was halted from 004-1046 to the 004-1053a (Prad). ​
    * 1343UT-The ckloff value dropped to the order of E-001. Tried both re-configuring and rebooting the dbbc. resolved the problem around 1420UT.The schedule was halted from 004-1348 to 004-1420b (Jay)     * 1343UT-The ckloff value dropped to the order of E-001. Tried both re-configuring and rebooting the dbbc. resolved the problem around 1420UT.The schedule was halted from 004-1348 to 004-1420b (Jay) 
 +   * 1553UT-The ckloff value dropped to the order of E-001. Tried re-configuring the dbbc. Think it worked well this time. The delays looks stable now. Keeping an eye for further improvement.The schedule was halted from 004-1556 to 004-1607 (Jay)
  
 **Yarragadee 12m** **Yarragadee 12m**
/home/www/auscope/opswiki/data/pages/handover/r4875.txt · Last modified: 2019/01/04 16:08 by Tiege McCarthy