User Tools

Site Tools


handover:rd1606

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
handover:rd1606 [2016/07/19 19:49]
Warren Hankey
handover:rd1606 [2016/07/20 13:31]
Ross Turner
Line 5: Line 5:
 Disk VSN: HOB+0076 Disk VSN: HOB+0076
  
-Data volume at beginning: ​6803GB+Data volume at beginning: ​6085.3GB
  
   * 1730 UT: Experiment looked to have started okay but the teslecope drives were stuck. (Arwin)   * 1730 UT: Experiment looked to have started okay but the teslecope drives were stuck. (Arwin)
-  * 1922 UT: With Brett and Jamie'​s help got the drives going again from Mt pleasant. First uselful scan is 201-1929 starting at 1929 UT.+  * 1922 UT: With Brett and Jamie'​s help got the drives going again from Mt pleasant. First uselful scan is 201-1929 starting at 1929 UT.(Arwin) 
 +  * 1954 UT: lots of " ch -308 ve total power integrator overflow"​ errors. I presume these are due to the 100 k system temp on channels 14 and 15. (Arwin) 
 +  * 202.1327UT: changed to module HOB+0114. Missed scan 202-1324, source 2145+0.82. First source on new module 1736+324 (Lucas). 
 + 
  
 {{tag>}} {{tag>}}
/home/www/auscope/opswiki/data/pages/handover/rd1606.txt · Last modified: 2016/07/20 13:31 by Ross Turner