User Tools

Site Tools


katherine_todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
katherine_todo [2014/07/26 00:46]
Jamie McCallum
katherine_todo [2014/07/26 06:21]
Jamie McCallum
Line 2: Line 2:
  
     * Phase cal testing (temperature stabilisation?​ Bad filters?)     * Phase cal testing (temperature stabilisation?​ Bad filters?)
-    * <​del> ​DBBC service - check cables, internal connections,​ bad boards)+    * DBBC service - check cables, internal connections,​ bad boards)
         * Apparently working as of 25/7/14 after replacing Fila OUT, reseating stack & PCI7200 card & cables.  ​         * Apparently working as of 25/7/14 after replacing Fila OUT, reseating stack & PCI7200 card & cables.  ​
-    * <​del> ​earthing of DBBC and MK5 units +    * earthing of DBBC and MK5 units using proper earth connections
-        * Using proper earth connections+
     * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL     * DBBC cont cal - tune for ~2-5% CONT CAL, 5-10% pulsed CAL
         * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board?         * CONT CAL seems to be triggered when PULSED CAL is? Check wiring on spare board?
/home/www/auscope/opswiki/data/pages/katherine_todo.txt · Last modified: 2014/07/26 06:21 by Jamie McCallum