User Tools

Site Tools


operations:agenda2013_10_31

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:agenda2013_10_31 [2013/10/30 02:50]
Jim Lovell
operations:agenda2013_10_31 [2013/10/30 03:20]
Jim Lovell
Line 32: Line 32:
     - Light in Ke control room (Brett, Martin).     - Light in Ke control room (Brett, Martin).
     - Fringe check script. OK now?     - Fringe check script. OK now?
 +    - Katherine RFI (Monitor full band (Martin, Jim))
 +    - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]]
 +      - Hand editing required. **Chris has volunteered to look at fixing the script(s), Jim?**
 +    - Which modules to use (Imogen, Jamie)
   - Roster   - Roster
     - 20-day marathon. OK?     - 20-day marathon. OK?
       - Some shifts may need to be tweaked a little (plus or minus an hour) to accommodate availability. ​       - Some shifts may need to be tweaked a little (plus or minus an hour) to accommodate availability. ​
 +    - Schedule for 2014
   - Recent software, hardware changes.   - Recent software, hardware changes.
     - DBBC:     - DBBC:
Line 40: Line 45:
       - Use v102 at Ke (hardware change needed for v104_2, needs testing, ongoing)       - Use v102 at Ke (hardware change needed for v104_2, needs testing, ongoing)
   - Operational issues   - Operational issues
-    - Ke RFI +    - Yarragadee support in November
-      - **Monitor full band (Martin, Jim)** +
-    - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]] +
-      - Hand editing required. **Chris has volunteered to look at fixing the script(s), Jim?** +
-    - Disk module usage+
   - Q & A   - Q & A
   - Next meeting : Tue 12 Nov at 2 PM   - Next meeting : Tue 12 Nov at 2 PM
/home/www/auscope/opswiki/data/pages/operations/agenda2013_10_31.txt · Last modified: 2013/10/30 03:20 by Jim Lovell