User Tools

Site Tools


operations:agenda2014_10_09

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:agenda2014_10_09 [2014/10/08 11:19]
liza
operations:agenda2014_10_09 [2014/10/09 01:15]
liza
Line 6: Line 6:
  
 1. Current issues: 1. Current issues:
-  * Wind stows to be marked in the handover notes +  * Wind stows (and other ongoing problems) have to be marked in the handover notes with time stamps 
-  * 26-m eRC checklist parameters returned [[uscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​documentation_ops2_pcfs9.10.5plus#​observations_on_the_26m_telescope_from_the_control_room|back to the page]]+  * Handover notes MUST be copied to the end message, especially if there were problems. ​ 
 +  * 26-m eRC checklist parameters returned [[http://​auscope.phys.utas.edu.au/​opswiki/​doku.php?​id=operations:​uscope.phys.utas.edu.au_opswiki_doku.php&​id=operations:​documentation_ops2_pcfs9.10.5plus#​monitoring_observations_on_the_26-m|back to the page]] 
 +  * Those who edit wiki, please make sure that none of the important links disappear.
   * TBA   * TBA
  
 2. AUST marathon outcomes 2. AUST marathon outcomes
 +  * Gathering feedback from observers, respond by next meeting.
 +  * Module assignment and confusion discussion
  
-3. Recently correlated experiments ​will be rewieved+3. Recently correlated experiments ​to be rewieved 
 +  *AUST25  
 +  *AUST29 
 +  *//​AUST34//​ 
 +  *//​AUST35//​ 
 +    (last two to be revisited later after the analysis)
  
 5. Roster, any questions or comments 5. Roster, any questions or comments
  
 6. Other items 6. Other items
/home/www/auscope/opswiki/data/pages/operations/agenda2014_10_09.txt · Last modified: 2014/10/09 01:15 by liza