User Tools

Site Tools


operations:agenda2016_04_21

This is an old revision of the document!


AuScope Operations Meeting Thursday 21st April, held at 12pm.

Chair: Ellen

Apologies: Nick

Attendees:

Current Issues

  • New PCFS at Hobart (thanks Jamie)
  • Maser maintenance at both Katherine and Yarragadee currently, hence Brett is not at the Observatory. Warren is at Mt Pleasant Tuesdays to Thursdays and occasionally Mondays.
  • CRDS82 - “still getting ve error: ERROR ch -308 ve total power integrator overflow” - was this fixed Bryn?
  • R4734 - Yarragadee: consistent offset between mark 5 and other computers of 0.1 - 0.4 visible in fmset with no sync error, could not be fixed. Caused by power failure affecting GPS receiver (new UPS installed) - had to change to Hobart's. Fixed itself 4+ hours later. Is there any way to fix this other than hope?
  • R1735 - A couple of instances where recorder started ~ 7-10 seconds before onsource at both Katherine and Yarragadee.
  • R1735 - Hobart e-remote froze, required hard reset of PCFS
/home/www/auscope/opswiki/data/attic/operations/agenda2016_04_21.1461155592.txt.gz · Last modified: 2016/04/20 12:33 by Ellen Manning