User Tools

Site Tools


operations:documentation.ivs.finishing_v2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation.ivs.finishing_v2 [2012/09/04 06:12]
Jim Lovell
operations:documentation.ivs.finishing_v2 [2019/02/09 00:41] (current)
Lucas Hyland
Line 2: Line 2:
 At the end of an observation,​ the antenna should return to stow and eRemoteControl will bring up a checklist to run through. Here are some notes on the checklist: At the end of an observation,​ the antenna should return to stow and eRemoteControl will bring up a checklist to run through. Here are some notes on the checklist:
  
-  * [[operations:​documentation.eRemoteControl_checklist_midob|Description of end experiment checklist parameters]]+  * [[operations:​documentation.eRemoteControl_checklist_end|Description of end experiment checklist parameters]]
  
-Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window:+If it was an IVS experiment, process logs, comment on the experiment and and send the end of experiment e-mail: 
 + 
 +  * [[operations:​documentation.ivs.commentsfile|Logs and end-of-experiment message instructions]] 
 + 
 +Unless there is another experiment to follow shortly, exit from the Field System by typing the following command in the eRemoteControl operator input window ​**NOTE: Do not do this for ''​hobart''​ the 26m PCFS!**:
 <​code>​terminate</​code>​ <​code>​terminate</​code>​
  
 Exit the log monitor program. Exit the log monitor program.
  
-If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at moblas@midwest.com.au +If Yarragadee is observing (and is not following on), email the operator to let him know the observation is finished and the telescope has gone to stow at auscope-yg@list.utas.edu.au  
 + 
 +<note important>​Note:​ it is no longer necessary to reboot PCFS computers at the end of experiments. Do not turn off ops8 either! </​note>​
  
 Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power. Please power-down the stairwell monitors using the switches under the main desk labelled Screen 1, Screen 2, ... when finishing an experiment or after hours to save power.
  
-If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v2|following ​on with another ​observation]].+If another experiment follows this one, go to the next step: [[operations:​documentation.ivs.newstart_v3_fs9.10.5|Following ​on with another ​experiment]]
/home/www/auscope/opswiki/data/attic/operations/documentation.ivs.finishing_v2.1346739138.txt.gz · Last modified: 2012/09/04 06:12 by Jim Lovell