User Tools

Site Tools


operations:documentation_austral15day_module_swaps

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
operations:documentation_austral15day_module_swaps [2013/11/29 03:24]
Jim Lovell
operations:documentation_austral15day_module_swaps [2013/12/09 05:47] (current)
Jim Lovell
Line 1: Line 1:
-^ Time  ^ Event ^ Local time at Katherine ^+====== Module Swapping Timetable ====== 
 +^ Time  ^ Event ^ Local time at Katherine ​^ Local time at Hobart ​^
 | 28 Nov 21.00.00 - 30 Nov 18.47.08 | Recording to Module 1 (16 TB), Bank A | | 28 Nov 21.00.00 - 30 Nov 18.47.08 | Recording to Module 1 (16 TB), Bank A |
 | 30 Nov 18.47.08 | Observer : bank swap, recording to Module 2 (16 TB), Bank B | | 30 Nov 18.47.08 | Observer : bank swap, recording to Module 2 (16 TB), Bank B |
Line 6: Line 7:
 | 30 Nov 18.52.08 - 2 Dec 16.00 | Recording to Module 2 (16 TB), Bank B | | 30 Nov 18.52.08 - 2 Dec 16.00 | Recording to Module 2 (16 TB), Bank B |
 | 2 Dec 16.00 - 17.00 | Yg : remove Bank B module, insert Module 4 (16 TB) | | 2 Dec 16.00 - 17.00 | Yg : remove Bank B module, insert Module 4 (16 TB) |
-| 2 Dec 19.00 - 19.30 | Ke : remove ​Bank B moduleinsert Module 4 (16 TB) | Tue Dec 3, 04.30 - 05.00 +| 2 Dec 17.00 - 4 Dec 17.30 | Recording to Module 3 Ke: 4 TB Bank B, Yg: 6 TB Bank A  ​
-Dec 17.00 4 Dec 17.30 | Recording to Module ​(TB), Bank A +Dec 17.30 18.30 | Yg : remove Bank A module, insert ​Module ​(16 TB) | 
-| | Yg : remove Bank A module, insert Module ​(16 TB) | +4 Dec 17.30 - 18.30 Ke : remove Bank B Module 3, insert Module ​(16 TB) in Bank A | Thu 5 Dec 03.00 - 04.00 
-| | Ke : remove Bank A module, insert Module 5 (16 TB) | +4 Dec 23.00         Hb : remove Bank A Module 3, insert Module 5 (16 TB). Module 3 for eTransfer | | Thu Dec 5, 10 AM 
-| 4 Dec 18.36.24 - 6 Dec 18.23.32 | Recording to Module 4 (16 TB), Bank B | +| 4 Dec 18.36.24 - 6 Dec 18.23.32 | Recording to Module 4. Hb: 16 TB Bank B; Ke: 16 TB, Bank A; Yg: 16 TB Bank B | 
-| | Yg : remove Bank B module, insert Module 6 (16 TB) | +6 Dec 18.24 - 18.28 | Yg : remove Bank B module, insert Module 6 (16 TB) | 
-| | Ke : remove Bank B module, insert Module 6 (16 TB) | +From 6 Dec 18.30 - 8 Dec 18.00 19.30 | Ke : remove Bank A module, insert Module 6 (16 TB) | Between Sat Dec 7, 04.00 and Mon Dec9 03.00 | 
-| 6 Dec 18.28.32 - 8 Dec 18.15.40 | Recording to Module 5 (16 TB), Bank A | +| 7 Dec 23.00 -> ? | Hb : remove Bank B module, insert Module 6 (16 TB) | | Sunday morning ​
-| | Yg : remove Bank A module, insert Module 7 (16 TB) | +| 6 Dec 18.28.32 - 8 Dec 18.15.40 | Recording to Module 5 (16 TB), Hb and Yg: Bank A; Ke: Bank B 
-| | Ke : remove Bank module, insert Module 7 (16 TB) | +8 Dec 18.16 - 18.20 | Yg : remove Bank A module, insert Module 7 (16 TB) | 
-| 8 Dec 18.20.40 - 10 Dec 18.07.48 | Recording to Module 6 (16 TB), Bank B | +8 Dec 18.16 - 18.20 | Ke : remove Bank module, insert Module 7 (16 TB) 
-| | Yg : remove Bank B module, insert Module 8 (16 TB) | +| | | | 
-| | Ke : remove Bank B module, insert Module 8 (16 TB) |+| 8 Dec 18.20.40 - 10 Dec 18.07.48 | Recording to Module 6 (16 TB), Hb and Yg: Bank B Ke: Bank A 
 +10 Dec 18.07.48 - 18.12.48 | Ke : Power down and remove Bank A module, insert blank 16 TB module into Bank A | Wed Dec 11, 03.37.48 AM | 
 +| After 10 Dec, 18.08 UT | Yg : remove Bank B module, insert Module 8 (16 TB) | 
 +After 10 Dec, 18.08 UT Hb : remove Bank B module, insert Module 8 (16 TB) |
 | 10 Dec 18.12.48 - 12 Dec 18.00.00 | Recording to Module 7 (16 TB), Bank A | | 10 Dec 18.12.48 - 12 Dec 18.00.00 | Recording to Module 7 (16 TB), Bank A |
 | | Yg : remove Bank A module, insert Module 9 (16 TB) | | | Yg : remove Bank A module, insert Module 9 (16 TB) |
Line 27: Line 31:
 | 13 Dec 19.00.00 - 15 Dec 17.48.08 | Recording to Module 9 (16 TB), Bank A | | 13 Dec 19.00.00 - 15 Dec 17.48.08 | Recording to Module 9 (16 TB), Bank A |
 | 15 Dec 17.53.08 - 16 Dec 16.00.00 | Recording to Module 10 (16 TB), Bank B | | 15 Dec 17.53.08 - 16 Dec 16.00.00 | Recording to Module 10 (16 TB), Bank B |
- 
- 
/home/www/auscope/opswiki/data/attic/operations/documentation_austral15day_module_swaps.1385695498.txt.gz · Last modified: 2013/11/29 03:24 by Jim Lovell