User Tools

Site Tools


operations:minutes2013_11_12

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
operations:minutes2013_11_12 [2013/11/12 03:45]
Jim Lovell
operations:minutes2013_11_12 [2013/11/14 03:17] (current)
Jim Lovell
Line 17: Line 17:
           * R4610           * R4610
   - Previous Action Items   - Previous Action Items
-    - Light in Ke control room (Brett, Martin). Still to do. Ask Martin to leave light on. +    - Light in Ke control room (Brett, Martin). Still to do. Ask Martin to leave light on until the IPS has a light hooked up to it
-    - Katherine RFI (Monitor full band (Martin, Jim)). WiFi turned off. Better? Is there a good data monitoring/​collection method? (Jamie) No better! 1850 MHz headsets also seen. (Jim)+    - Katherine RFI (Monitor full band (Martin, Jim)). ​The WiFi has been turned off. Better? Is there a good data monitoring/​collection method? (Jamie) No better! 1850 MHz headsets also seen. (Jim)
     - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]]     - Processing logs, multiple disks [[operations:​agenda2013_10_08_eg1|Example]]
-      - Hand editing requiredChris has volunteered to look at fixing the script(s) +      - Hand editing ​is still required ​but Chris has a new script ​being tested. 
-    - Which modules to use (Imogen, Jamie). See [[operations:​start|Operations page]]+    - Which modules to use (Imogen, Jamie). A list of which modules to use for each experiment is now on the wiki. See [[operations:​start|Operations page]]
     - 26m IVS documentation will need updating before May 2014     - 26m IVS documentation will need updating before May 2014
-    - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired).+    - Question for Brett: how to find out the network status at the three sites (e.g. 3G or wired). Jim is working on a new monitoring script that will ring alarms/​warnings when the network goes down etc.
   - Recent software, hardware changes.   - Recent software, hardware changes.
     - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing     - Jim to talk to Gino about diagnosing the problem at Katherine. Ongoing
-    - Mark5 to Yarragadee for conditioning ​+    - Mark5 to Yarragadee for conditioning: shipped
   - Operational issues   - Operational issues
     - Jamie in Ceduna from this week until end of LBA run (back on 27th). On call: phone Ceduna control room 08 8625 3070 (pref), x6388     - Jamie in Ceduna from this week until end of LBA run (back on 27th). On call: phone Ceduna control room 08 8625 3070 (pref), x6388
-    - AUST17 cancelled+    - AUST17 ​has been cancelled
     - LBA Observing next week. Please volunteer :-) Can do IVS and LBA simultaneously from Mt Pleasant.     - LBA Observing next week. Please volunteer :-) Can do IVS and LBA simultaneously from Mt Pleasant.
-    ​- Upcoming '​marathon'​ observing run. Any questions?​ +    - Next meeting will focus on observing the big session. Helpful to get as many observers to the meeting as possible. ​Doodle poll to be used
-    ​- Next meeting will focus on observing the big session. Helpful to get as many observers to the meeting as possible.+
   - Q & A   - Q & A
-    - Jim chase up eremCtrl with Stuart +    - Jim chase up eremCtrl with Stuart ​for Warkworth 
-    - Pointing check at Yg problematical for OHIG85.+    - Pointing check at Yg problematical for OHIG85. Unknown reason.
     - Alarm when the network dies. And how to fix the problem. (Jim)     - Alarm when the network dies. And how to fix the problem. (Jim)
   - Next meeting : ?   - Next meeting : ?
/home/www/auscope/opswiki/data/pages/operations/minutes2013_11_12.txt · Last modified: 2013/11/14 03:17 by Jim Lovell