User Tools

Site Tools


operations:monitoring.ivs.etransfer

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
operations:monitoring.ivs.etransfer [2015/03/26 20:50]
liza
operations:monitoring.ivs.etransfer [2015/03/26 20:52] (current)
liza
Line 12: Line 12:
 If on top of the page of Handover Notes you see the following text: If on top of the page of Handover Notes you see the following text:
  
-// 
  
- 
-<note important>​**Achtung! 
-R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​ 
- 
-// 
  
  
 +<note important>​**Achtung! R1 TRANSFER IN PROGRESS! MONITORING REQUIRED!**</​note>​
 R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]] R1 monitoring instructions:​ [[operations:​monitoring.ivs.etransfer|operations:​monitoring.ivs.etransfer]]
  
/home/www/auscope/opswiki/data/pages/operations/monitoring.ivs.etransfer.txt · Last modified: 2015/03/26 20:52 by liza