User Tools

Site Tools


schedules:anz

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
schedules:anz [2012/07/04 06:05]
Jim Lovell
schedules:anz [2012/07/04 22:44] (current)
Jim Lovell
Line 3: Line 3:
   * ANZ001 : 2012 July 4, 03:00 UT (2h duration).   * ANZ001 : 2012 July 4, 03:00 UT (2h duration).
     * Description:​ Test experiment to verify configuration,​ check DBBC power levels etc.     * Description:​ Test experiment to verify configuration,​ check DBBC power levels etc.
-    * Status : Observed. Yg and Ke modules being sent to Hb for eTransfer. Hb data being eTransferred. Ww data to be ETransferred+    * Status : Observed. Yg and Ke modules being sent to Hb for eTransfer. Hb data have been eTransferred. Ww data to be eTransferred
     * Schedule file (compressed) : {{:​schedules:​anz001.skd.zip|anz001.skd.zip}}     * Schedule file (compressed) : {{:​schedules:​anz001.skd.zip|anz001.skd.zip}}
     * Logs from all 4 stations {{:​schedules:​anz001_logs.tgz|anz001_logs.tgz}}     * Logs from all 4 stations {{:​schedules:​anz001_logs.tgz|anz001_logs.tgz}}
/home/www/auscope/opswiki/data/pages/schedules/anz.txt · Last modified: 2012/07/04 22:44 by Jim Lovell