AUG020
Hobart
Module: HOB+0104, 0.77 GB
- UT0630 Experiment started OK (JS)
Katherine
Module: HOB+0128, 0.77 GB
- UT0630 Experiment started but with large clock offsets (JMC)
- UT0632 Experiment halted to reconfigure DBBC.
- UT0638, schedule resumed, UT0652 after problems with checkmk5 procedure but clock drifts continue.
- 11:44 UT - Schedule stopped as delay differences kept drifting, with DBBC reset achieving nothing. (Ellen)
- UT2310 Halted for DBBC reset, delay differences still drifting (Bryn)
- UT0004 Experiment Halted, delay differences drifting faster.
Yarragadee
Module: HAY-0050, 0.64 GB
- UT0630 Experiment started OK (JS)
~~DISCUSSION~~